Roof Top Membrane - Laying DuO Membrane
On site laying the DuO High Tech AGR Membrane

Recent Works
Project: Roof Top - 766.92m2 Problems: The current waterproofing had aged and was affected by weathering. The existing membrane was breaking down in some locations. Membrane was damaged allowing water to penetrate. Insufficient falls causing water to pond on the roof. Leakages were reported. Conclusion: Total renovation of the waterproofing on the roof was required. The roof required a correction of its falls to allow the water to drain freely. Thermal insulation – PIR tapere